Title | | » | Export > Transition / Isolation List with scheduling seems broken for counting multiple methods |
Assigned To | | » | Kaipo |
Type | | » | Defect |
Area | | » | Skyline |
Priority | | » | 1 |
Milestone | | » | 21.2 |
I ran into this multiple times during the course. When I would use File > Export > Transition or Isolation list and choose "Multiple methods" and Method type = "Scheduled", then the resulting method counts seemed not to match well with the scheduling graph showing concurrent transitions.
You can reproduce this by running the TestMethodRefinementTutorial and stopping at page 24. Then you will see that you need to raise the maximum number of concurrent transitions to 48 to get the number of methods down to 1, but the graph shows 16 maximum concurrent transitions with the 4-minute scheduling window in place.
So, why wouldn't the method count go down to just 1 with 16 concurrent transitions?
Oops! It is showing a concurrent precursor count instead of the transition count. There are 3 transitions per precursor.
Kaipo, I think you likely broke the scheduling graph when you did diaPASEF support. Please fix it and add a test to make sure it stays fixed in the future.